HUBBARD
LIBRARY
CONSTRUCTION
Library Home |
Local Catalog Only
| WorldCatLocal@Fuller |
Periodical Titles |
Databases |
Construction
photos
| |
|
�We want it to be a �library of
the future��a center that offers a way of connecting us with the global
Christian community, and of connecting the global Christian community to
us.�
President Richard J. Mouw |
�President Hubbard embraced some
revolutionary ideas that have forever changed us; may we never walk past this building without
remembering, with gratitude, who David Allan Hubbard was.�
Trustee Jody Vanderwel |
�One of our trustees has said that
David Allan Hubbard was a man of 'unlimited peripheral vision'�and we
believe this library will be a place of unlimited peripheral vision.�
Associate Provost for Library Services David Bundy |
| |
|
Timeline of Construction Progress
|
Floor
Plan of the Library |
| November 20, 2006 |
The Pasadena City Council approves the Fuller Theological
Seminary Pasadena campus master plan, including the location for the
Hubbard Library. It will extend south from the present
building to Union Street.
News Release |
| May 21, 2007 |
Ground Breaking Ceremony.
News Release |
| August 16, 23, 2007 |
Existing building moved from construction site. |
| September 2007 |
Installation of underground electrical infrastructure.
"A new library for Fuller
Theological Seminary" by Howard Wilson, the Semi, Sept. 24, 2007 |
| November 2007 |
Electricity re-routed.
Perimeter supports placed in ground, preparing for the excavation of
the basement. |
| December 2007 |
Basement dug down two stories. Cement steps removed from
south side of existing building with jack hammers. |
| February 2008 |
Reinforced concrete foundation poured. |
| March-April 2008 |
Concrete floors, walls, and columns for two basements poured. |
| May 2008 |
Ground floor concrete poured. |
| June 2008 |
Steel structure for three above ground floors built. |
| August 2008 |
Interior walls being constructed. Exterior cement walls
added. |
| October 2008 |
Windows being added. Interior work continues, including
information access services desk, bathrooms, study rooms, painting. |
| Nov. 2008 |
Redwood entrance. Landscaping started, and front ramps,
steps. Metal work for 3rd floor balcony added. Compact
shelving installed in basements. |
| Dec. 2008 |
Shelving installed. Furniture moved in. Move
collections from existing building to new building.
"The Library: it is a-changin'" by Michael Murray, the Semi,
Dec., 1 2008 |
| Jan. 2009 |
The new section opened on January 5th, 2009. Renovation
began on the existing building. |
| Jan-April 2009 |
Annette Weyerhaeuser reading room remodeled. New computers
for student research lab. Elevator removed from existing
building. Shelving and carpet replaced. Sprinkler system
added on upper floors. Office space refurbished. |
| May 18, 2009 |
Grand opening of the new and renovated sections of the library.
Article from Fuller News and Events by David Bundy, Howard Wilson
and Michael Murray.
Articles from Fuller News and Events by Joel Green and Courtney
Bacon.
Article about the Legacy of David Allan Hubbard
Fuller Focus article
"David Allan Hubbard Library Opens" Spring 2009
|
|